Use a utility knife to cut the fabric to size. Now, fill the trench halfway (6-inches deep) with large gravel stones to form your base layer. Then, rake the stones for a uniform spread before tamping them down into position with a mechanical roller. Finally, lay your crusher run gravel to form the top layer of your driveway.
3. Bill Of Quantities. Uploaded by: Ananda Mala Lestari. August 2020. PDF. Bookmark. Download. This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form.
Bill of Quantities (bill of quantity), also known as "BOQ" or "BQ" in short, is a document prepared by a quantity surveyor, or cost consultant that provides the data of quantity of materials, labours, and their costs in construction work. Bill of Quantities (BOQ) is an important inclusion in the tender.
at the date of the tender shall lay down the minimum standards required for the earthworks. Where these Codes and Standards are in conflict, or are less severe than the equivalent provisions of the Malaysian Standards, the latter standards shall take precedence: BS 5930 Code of Practice for Site Investigation
summary of bill of quantities routine maintenance work (km 00 to km 14) bill no.2 sub-base and base code description unit rate (rs.) quantity amount (rs) 201 granular sub-base cm 1,937.75 202 aggregate base course cm 2,275.02 203a asphaltic base course plant mix (class-a) cm 18,744.95 203b asphaltic base course (class-b)** cm
Bill of Quantities 1 Provisional Sum Item Description Unit Quantity SL. No Procument Item Details ... Providing and laying crusher run macadam on a prepared surface, spreading and mixing, watering and compacting to form a layer of base course as per drawing and technical specifications. (by mix in place
A Bill No : 01 - PRELIMINARIES A.1 Lot 1:Bill2-Bill of Quantities for Construction of Antenatal Clinic and M & E Offices at Aweil Northern Bar E l Ghazel Item Description Qty Unit The contractor shall provide and maintain temporary sheds for the storage of materials, tools, and tackle and the use of all persons employed on the Site . Those used
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specifications. Cum 8499.0 5 Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing, watering and compacting to form a layer of Base course …
2.0 STANDARD BILL OF QUANTITIES Standard System Bill of Quantities must be prepared in accordance with the latest edition of the Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) and Standard Methods of Measurement (MOM). Format and Layout Every Bill of Quantities should be presented in a common format …
Bill of Quantity S.No ... laying, spreading,watering, levelling and compaction of crusher run material 2.4 for Granular subbase course grading as per table 12.4 of standard specification all m3 5320.50 complete as directed by engineer.[SS1202]* Providing and laying crusher run macadam on a prepared ...
brieck work diy quantities . T22:01:43+00:00. BrickWork Calculation Calculator Quantity of . Apr 20, 2018 Quantity of cement, Sand or Mortar Required for Brickwork: 1:6 ratio of cement mortar is usually used for brickwork In order to calculate the amount of Cement, Sand or Mortar required or brickwork firstly find out the amount of mortar …
Borrow pits Providing, laying, spreading and compacting embankment with borrow material as per Drawing and Technical Specifications. Cu.m. 2665.0 3 Crusher Run Macadam sub-base. Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing, watering and compacting to form a layer of sub-base course as per Drawing
We supply and deliver approved quality G2 Crusher run /base Course material (Base and sub-base) in Cape Town, Johannesburg, Pretoria and Durban. Nationwide deliveries available . Specifications: G2 is made from Sound rock, boulders or coarse gravel. G2 may contain up to 10% by mass of approved natural fines not necessa
Bill of Quantities can help the homeowner to compare the rate quoted by different contractors. It describes the amount of the job as per the sketches and designs of the project. It offers a probable or predictable agreement amount which is extremely significant to the client. Provide a basis for the valuation of interim payments or payment …
Providing and laying Granular Sub-Base Material By Mechanical means Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specification m³ 1911.0 6 Crusher Run Macadam Base and Sub Base, Providing and laying Crusher Run …
TRANSCRIPT. Dalam menghitung Bills of Quantities Q.S menggunakan standard tertentu (SMM) Biasanya setiap Negara yang menggunakan sistim Q. S, memiliki standar-standar yang diperlukan. Dari dokumen Gambar dan persyaratan2 lainnya, harus ditransfer kedalam Bill of Item yang sesuai dengan struktur bidang pekerjaan ybs.
Pada 17 September 2015, bertempat di Bilik Mesyuarat Tingkat 19 Menara TIMA, satu taklimat mengenai portal PWCIC dan juga taklimat khas penggunaan Ratol telah diadakan dengan wakil Bahagian-Bahagian CKUB. Taklimat diadakan sempena pelantikan Wakil PWCIC Bahagian dan tahniah diucapkan di atas pelantikan tersebut. JKR Rates …
Kerja-kerja menurap batu baur (crusher run) Membersihkan Tapak Bina Menyediakan peralatan, jentera dan pekerja bagi kerja-kerja membersihkan tapak serta mengorek atau mencakar dengan kedalaman 50 mm dan tidak melebihi 150 mm pada permukaan lapisan 'base' dan lain-lain seperti yang diarahkan oleh Pegawai Penguasa di tapak. Bil.
Electrical Provisional Bill PART B: ELECTRICAL & ELECTRONICS ELECTRICAL BILL OF QUANTITIES BILL NO. 3 Item Description Unit QTY Rate Amount 1 Light Switches Supply and install the following light switches complete with cover plate in the position as indicated on the drawings, draw boxes measured elsewhere. 1,1 16A Single lever Supply No 10 R R
Crusher Run is a blended mix of coarse aggregate and fine aggregate. The combination of both crushed stone and stone dust creates a low void content (the amount of space or air between the pieces of rock in a mix) that is valuable in concrete construction for its compaction ability and drainage characteristics.
Standard bill of quantities. ... Contoh Borang kaji selidik - Survey Mohd Nizam Mohd Zan. ... PREPARATION OF ROAD BASE Step 1 Lay crusher run on top of sub-base and compact by the roller. The thickness for any layer is according to specification. Step 2 Carry out field density test and CBR test on the road base as per specification if …
5/28/2018 JKR standard specifications. 10/188. A/8. 23.4 The Contractor shall provide suitable spraying equipment for regular spraying of waterover existing roads and access roads, completed as well as incomplete road and otherbarren areas of the Site used by the Contractor and as when directed by the S.O.
Bill of Quantities. 1 Provisional Sum Procument Item Details. SL. ... Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing, ... Contoh MyCESSM. Abdul Karim. BOQ-HOSPITAL-137-177. BOQ-HOSPITAL-137-177. Abinash Mandal. annexure. annexure. Manivannan J. Pathibhara Ls.
An average production rate in common material (no rock) from an equipment performance handbook might be 150 bank cubic meters per hour for a 300 hp power-shift tractor with ripper. The tractor cost is $80/hr. The rate of excavation would be. P = (150 m 3 /hr)/ (2100 m 3 /km) = .07 km/hr. UC = 80/.07 = $1143/km.
(i) B.Q. - Bills of Quantities (ii) CIAST - Pusat Latihan Pengajar dan Kemahiran Lanjutan (iii) CIDB - Construction Industry Development Board (iv) CoW - Clerk of Works (v) DGFR - Director General of Fire and Rescue (vi) DOE - Department of Environment (vii) DOSH - Department of Occupational Safety and Health
shape and regular surface to lay WC Example: ACB28, BMB20 cri-sab2832-july2009 24 2. Wearing Course: Provide durable skid-resistance surface, protect pavement, withstand abrasion and traffic stresses, provide good and safe running surface, drainage Example: ACW20, BMW14 Quality tests –aggregate, binder, and premix